Dover Engineering Limited has executed quite a number of projects. Some of the notably major projects include:

MOBIL PRODUCING NIGERIA – SATELLITE FIELD DEVELOPMENT PROJECT.

In 2006, Dover Engineering Limited became the first Engineering Company to execute, 100% in Nigeria, detailed engineering design of fixed offshore platforms (3 New Wellhead Platforms). These platforms have been successfully fabricated and shipped out for installation. Over 100,000 manhours was expended in the execution of the single project.

TOTAL UPSTREAM NIGERIA – EGINA DEEPWATER FPSO FEED OF SPS AND UFR PROJECT

In 2010, Dover Engineering Limited became the first Nigerian Engineering company to execute in Nigeria, the Front End Engineering Design (FEED) of Subsea Production Systems (SPS) and Umbilical Flowlines and Risers (UFR) of a Deepwater FPSO Development Project.

SHELL PETROLEUM DEVELOPMENT COMPANY (SPDC) – SOUTHERN SWAMP GAS GATHERING PIPELINE (SSGGP) PROJECT

Some other projects executed by us include but not limited to:

  • NNPC – EXPANSION OF ESCRAVOS-LAGOS GAS PIPELINE SYSTEM, PHASES 1 & 2
  • TOTAL UPSTREAM NIGERIA – OML 100 PHASES 1 & 2 ODD1-ODP1 FIRE WATER
  • TOTAL UPSTREAM NIGERIA – OML 100 ICSS UPGRADE
  • FOUNDATION DESIGN FOR 56M TOWERS
  • MOBIL PRODUCING NIGERIA – GEREGU PIPELINE AS-BUILT PROJECT
  • NNPC – ESCRAVOS RIVER CROSSING
  • NNPC – GAS BOOSTING
  • SPM BOAT CATCHER
  • NLNG – CONDENSATE STABILIZATION UNIT DEBOTTLENECKING PROJECT
  • PONTICELLI – DESIGN REVIEW OF GAS HANDLING FACILITIES
  • SNEPCO – BONGA RADAR SUPPORT PROJECT
  • TOTAL UPSTREAM NIGERIA – BASIC ENG. FOR NORTHERN OPTION PIPELINE DESIGN PROJECT
  • TOTAL UPSTREAM NIGERIA – AKOP FPSO DEEPWATER DESIGN PROJECT
  • NLNG – OMOKU COLD ROOM STORAGE FACILITY DETAILED ENGINEERING DESIGN PROJECT
  • EXXONMOBIL – ERHA NORTH PHASE 2 DEEPWATER PROJECT
  • NNPC – ODIDI -WARRI GAS PIPELINE PROJECT